top of page

Call Us: 800-890-9755
Hydraulic Load Test
A Hydraulic Load Test
This test determines the volume of clean water an absorption area can absorb in a twenty-four hour period. Indications A hydraulic load test shall be recommended:
• Structure has been vacant more than 7 days
• New water sources directed to the system within last 30 days
• Soil fracturing activity within the last 30 days
• High water conditions are observed • When there is a significant difference in the current water use in a structure compared to the anticipated use of the structure.
(Ex: Under used = 1 person has been using, will be a family purchasing).
Preparation Note: During the test, NO EFFLUENT may enter the absorption area.
bottom of page